Note: This article is discontinued.
You can find the current article here: 7410023 / UZD350-4 junction and branch box
- Product description
-
Product descriptionUnderfloor accessory box for screed-covered underfloor installation ducts with sheet steel side walls. To mount installation units of the selected nominal size. Height can be infinitely adjusted to the nominal screed height (rapid adjustment possible) and the screed can be worked flush to the screed scraping edge. With noise decoupling option after screed laying and can be used with system accessories, also for heavy-duty application.
- Technical data
-
Technical data
CO₂ Footprint (GWP) Cradle-to-Gate 23,486 kg CO₂e / 1 Piece Decouplable yes Dimension 510x467x70 Dimension A 467 mm Dimension a 362 mm Dimension b 383 mm Dimension B 510 mm Dimension d Ø 305 mm Duct height, min. 28 mm Floor plate yes For pipe connection no Height-adjustment range, max. 125 mm Height-adjustment range, min. 70 mm Installation opening for flush-mount unit Round Installation opening for on-floor tank no Material Steel Minimum screed height 70 Nominal size 350 mm Nominal size for device installation units R9 Screed height, max. 125 mm Screed height, min. 70 mm Seal installation option yes Suitable for screed-covered underfloor ducts yes Suitable for screed-flush closed underfloor ducts no Suitable for underfloor ducts yes Surface Strip galvanized Trunking height, max. 48 mm Trunking width, max. 350 mm Trunking width, min. 190 mm - All types
- Downloads
-
Data sheet UGD 350-3 R9 / 7410124 , 0.21MB , pdfEU declaration of conformity UGD 350-3 R9 / 7410124 , 0.13MB , pdfREACH Declaration of conformity UGD 350-3 R9 / 7410124 , 0.27MB , pdfRoHS Declaration of conformity UGD 350-3 R9 / 7410124 , 0.28MB , pdfLabel approval VDE symbol approval, EÜK , 0.12MB , pdfMounting instructions EÜK screed-covered duct system generation 3 , 76.05MB , pdfMounting instructions EÜK screed-covered duct system generation 4 , 10.26MB , pdf